Wetroom System

Complete wetroom system: vinyl sheet floors & walls, welded seams, compatible drains, coving & corners. Hygienic, low VOC. Materials‑only B2B supply.

Contact Us
Wetroom System

What's Included

We supply materials only to B2B clients (distributors, contractors, developers, architects, FM). Installation is performed by your appointed wetroom contractor to the system manual and local code.

System Components

A wetroom system is a coordinated package of vinyl sheet flooring and wallcoverings with hot‑welded seams, compatible drain kits (linear/point), membranes, coved skirtings/upstands and preformed corners—engineered to create a continuous, watertight and hygienic envelope for showers and permanently wet zones.

Typical applications: healthcare bathrooms, accessible units, MFH and student housing, hotels/spa back‑of‑house, locker rooms and poolside changing (system‑dependent).

  • Vinyl sheet floor for wet areas with hot‑welded seams.

  • Waterproof membrane (under or integrated, as specified).

  • Drain kits: linear or point drains with vinyl‑weldable flanges/clamping rings.

  • Coved skirting & upstands: preformed/site‑formed with capping strips.

  • Prefabricated corners: internal/external for reliable detailing.

  • Vinyl wallcovering / hygienic wall panels with sealed joints.

  • Ancillaries: welding rods, primers, sealants, trims and adhesives.

Why Choose a System

  • Assured waterproofing: membrane + welded seams + drain interface designed to work together.

  • Hygienic surfaces: continuous, grout‑free; clean with neutral detergents/disinfectants.

  • Accessibility: flush entry, coved junctions and consistent falls to drains.

  • Slip control: wet‑area textures and defined R‑ratings where required.

  • Lifecycle value: reduced ingress risk vs. tiled grout; straightforward surface refresh if ever needed.

  • Aesthetic coordination: unified floor‑to‑wall palette and contrast options for wayfinding.

Technical &
Compliance

Verify exact values and details for your jurisdiction and chosen system (datasheet/DoP/installation manual).

Parameter

Typical Range / Note

Design & Detailing Notes

  • Substrate & falls: ensure flatness and moisture control; plan consistent falls without ponding.

  • Door thresholds: design flush entries with water barriers as needed; coordinate with corridor finishes.

  • Penetrations: seal around pipes, rails and benches using compatible collars/sealants.

  • Wall junctions: continue upstands behind fixtures; maintain welded or sealed joints.

  • Accessibility contrast: use high‑contrast textures/colours for edges and key zones.

Quick Comparison

Wetroom System vs Modular LVT/SPC in Bathrooms

Criterion

Wetroom System (Sheet Vinyl)

LVT/SPC (Modular)

Sector Guidance

Healthcare

+

Use preformed corners, coved upstands and clinical drain kits; verify chemical resistance for cleaning agents.

MFH & Hospitality

+

Compact linear drains for ensuite showers; coordinate wall finishes for humidity/steam performance.

Education & Public Facilities

+

Locker rooms and team showers: robust slip control and corner/edge protection; plan traffic flows to avoid splash zones.

Logistics & B2B Supply

Materials‑only supply. Installation by your wetroom contractor/installer to the system manual.

We supply:

Order sizes:

complete system kits or individual components (floor/wall vinyl, drains, corners, rods).

Lead times:

stock vs made‑to‑order colours and drain types.

Docs:

datasheets, DoP/DoC, fire/slip tests, installation manuals, EPD on request.

Samples:

texture chips, colour boards.

Support:

spec wording, detail drawings, maintenance guides.

FAQ

Here you'll find answers to the most common questions about wetroom systems.

Can LVT or SPC be used inside the shower area?

+

No. For showers and permanently wet zones, specify a wetroom vinyl sheet system with welded seams and compatible drains.

Do you provide the drain?

+

We supply drain kits compatible with vinyl welding (system‑dependent) or coordinate with your approved drain vendor.

How are corners and upstands formed?

+

With preformed corners and coved skirtings/upstands for continuous waterproof detailing.

What slip rating is required?

+

Specify wet‑area textures and match the R‑rating required by local code for showers/changing rooms.

Do you install?

+

No—materials only. Installation is by your appointed wetroom contractor.

Ready to specify a Wetroom System?

  • Request Specs & Commercial Offer (area m², drain type, slope detail, wall finish, timeline).
  • Order Samples (texture set, colour shortlist).
cta-trivaro-wetroom-system.jpg